I just purchased 100 courtside seats ( about 4 days ago). The constructions has been stuck on completed in 4 days for 4 days. is there a solution?

John

This Post:
00
118405.2 in reply to 118405.1
Date: 11/10/2009 13:54:47
JMDCeltics
III.4
Overall Posts Rated:
31873187
The time that appears is estimated time and it usually takes more days than the original date of ending.
Just be patient.
Best regards.

This Post:
00
118405.3 in reply to 118405.1
Date: 11/10/2009 14:34:09
Overall Posts Rated:
00
I don't know if it's a coincidence or not, but I have added to my arena twice. Once when I had a home game during the construction time and once when I had nothing but away games. The construction that took place when I had a home game took longer than the estimate and that that I had done while I was away was right on time.

Is there anything to that or is just one of those random type deals?

This Post:
00
118405.4 in reply to 118405.2
Date: 11/10/2009 15:43:41
Overall Posts Rated:
00
I understand it is an estimate, but it has been sitting on 4 days remaining fro several days now. and 100 seats shouldn't take that long to construct. I am wondering if there is something hinky?

This Post:
00
118405.5 in reply to 118405.4
Date: 11/10/2009 15:50:08
JMDCeltics
III.4
Overall Posts Rated:
31873187
If it could be a bug try to ask at bugs forum. Anyway i´ve suffered something similar.

This Post:
00
118405.6 in reply to 118405.5
Date: 11/10/2009 15:53:51
Overall Posts Rated:
587587
It's not a bug. It's an estimate and it gets evaluated each update. If nothing was done or there were problems, the estimate remains the same. If they got the work done, the estimate goes down accordingly.

Perhaps the OP's construction crew has gone awol. He just needs to wait till they decide to return and start working.

Last edited by GM-WallyOop at 11/10/2009 15:54:18

This Post:
00
118405.7 in reply to 118405.6
Date: 11/10/2009 15:56:28
Overall Posts Rated:
00
Do I need to bribe the foreman? Cause his crew has been off for a week now.

This Post:
00
118405.8 in reply to 118405.7
Date: 11/10/2009 15:58:12
Overall Posts Rated:
587587
Whatever you do, don't hire the same company again. :-)

This Post:
00
118405.9 in reply to 118405.8
Date: 11/10/2009 16:00:48
Overall Posts Rated:
00
I think he is using government contractors. They are waiting for free health care:-(

This Post:
00
118405.10 in reply to 118405.1
Date: 11/10/2009 16:01:40
Overall Posts Rated:
959959
(115207.5) - i think he explains it's the best

So you get know the bb equivalent for a strike

OT: "they own the factorys, but we are on strike Anti anti"

http://www.youtube.com/watch?v=3vkE5Xs5omA

sorry for posting this off topic sond, but it didn't go out of my head ;)